Welcome to Xiamen Sengong Packing Equipment Co. Ltd

Company new

How to install the C13 Double Chamber Tea Packaging Machine

Writer: admin Time:2020-01-14 06:01:52 Browse:826℃



1.Machine construction




2.Assembly machine

1:Install the tag bracket.

Open the glass door with a screwdriver



          

Remove the tag bracket screws

   

Install the tag bracket,use wrench No.14 to fix the screw.Install the eye mark well.


     


2:Install the thread bracket.(Use 5mm inner hexagon)

      



Install glass door,Fix the glass door with a screwdriver.

Directly use your hand to install the tag switch.


        


3:Install the hopper

Install the hopper as shown in the figure and fix it with a 19mm wrench.


     

   


4:Install the conveyor belt.

Plug in the power supply separately

  


Now the machine is installed successfully.Check again you have finished all the steps.

1:Install the tag bracket.

2:Install the thread bracket.

3:Install the hopper

4:Install the conveyor belt.






CONTACT US

WeChat: +8613779964655

Phone: +8618059211697

Tel: +8618059211697

Email: Sales@sengongmachine.com

Add: Add:228, Tianfeng Road, North Industrial Zone, Jimei District, Xiamen, Fujian, China.

Scan the qr codeClose
the qr code